{"id":1835,"date":"2020-11-23T05:44:12","date_gmt":"2020-11-23T06:44:12","guid":{"rendered":"http:\/\/pekasis.com\/en\/?p=1835"},"modified":"2020-11-23T05:44:12","modified_gmt":"2020-11-23T06:44:12","slug":"gas-production-resumed-at-phase-16-platform","status":"publish","type":"post","link":"https:\/\/pekasis.com\/en\/gas-production-resumed-at-phase-16-platform\/","title":{"rendered":"Gas Production Resumed at Phase 16 Platform"},"content":{"rendered":"<div>\n<div class=\"item-body\">\n<div class=\"item-text\">\n<div class=\"item-summary\">\n<div class=\"item-summary\">\n<p class=\"summary introtext\">Production operations has resumed on the Phase 16 Platform of South Pars offshore gas field in the Persian Gulf waters.<\/p>\n<\/div>\n<div class=\"item-body\">\n<div class=\"item-text\">\n<p>The gas platform of South Pars Phase 16 resumed operation after reconstruction of the damaged part of the offshore pipeline of the phase. The platform has a production capacity of 500 million cubic feet of gas.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-1836 aligncenter\" src=\"http:\/\/pekasis.com\/en\/wp-content\/uploads\/2020\/11\/Phase-16-300x225.jpg\" alt=\"\" width=\"407\" height=\"305\" srcset=\"https:\/\/pekasis.com\/en\/wp-content\/uploads\/2020\/11\/Phase-16-300x225.jpg 300w, https:\/\/pekasis.com\/en\/wp-content\/uploads\/2020\/11\/Phase-16-195x146.jpg 195w, https:\/\/pekasis.com\/en\/wp-content\/uploads\/2020\/11\/Phase-16-50x37.jpg 50w, https:\/\/pekasis.com\/en\/wp-content\/uploads\/2020\/11\/Phase-16-100x75.jpg 100w, https:\/\/pekasis.com\/en\/wp-content\/uploads\/2020\/11\/Phase-16.jpg 534w\" sizes=\"auto, (max-width:767px) 407px, 407px\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>According to Pars Oil and Gas Company, the platform of phase 16 of South Pars, which had become non-operational due to damage to part of the offshore pipeline of the phase in November last year, after reconstruction and replacement of part of the gas transmission pipeline, came online on Friday, November 20 with a capacity of 500 million cubic feet (14 million cubic meters).<\/p>\n<p>Alireza Ebadi, Production and Operations Director of Pars Oil and Gas Company, stated that the offshore pipeline of phase 16 of South Pars had broken and stopped production several times, adding: &#8220;Due to the possibility of further damage to the pipeline on the platform side due to high pressure and temperature of gas flow, 32 km of the pipeline has been replaced from Phase 16 platform.\u201d<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p>News Code: 16<\/p>\n<p><a href=\"https:\/\/en.shana.ir\/news\/309929\/Gas-Production-Resumed-at-Phase-16-Platform\">www.shana.ir<\/a><\/p>\n<p>&nbsp;<\/p>\n<div class=\"column mcb-column one column_fancy_heading \">\n<div class=\"fancy_heading fancy_heading_icon\"><\/div>\n<\/div>\n<div class=\"column mcb-column one-second column_column \">\n<div class=\"column_attr clearfix animate fadeInRight\" data-anim-type=\"fadeInRight\">\n<p class=\"big\">\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Production operations has resumed on the Phase 16 Platform of South Pars offshore gas field in the Persian Gulf waters. The gas platform of South Pars<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":2,"featured_media":1836,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[6],"tags":[],"class_list":["post-1835","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/posts\/1835","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/comments?post=1835"}],"version-history":[{"count":1,"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/posts\/1835\/revisions"}],"predecessor-version":[{"id":1837,"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/posts\/1835\/revisions\/1837"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/media\/1836"}],"wp:attachment":[{"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/media?parent=1835"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/categories?post=1835"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pekasis.com\/en\/wp-json\/wp\/v2\/tags?post=1835"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}